Fremont Area Medical Center Tower Addition

This project was a patient tower addition to the existing Fremont Area Medical Hospital. This consisted of a six-story addition, along with a five-story renovation to the current structure. The work was constructed in two phases so as not to interfere with the operational hospital.

2013 thru 2015
Client: Sampson

Our scope of work included:

  • Panelized & Stick Framed Exterior Cold-Formed Steel Framing 
  • Sheathing 
  • Rough Carpentry 
  • Self-Adhesive Applied Air Barrier 
  • EIFS 
  • Fireproofing 
  • Interior Framing 
  • Drywall 
  • Insulation 
  • Firestopping 
  • Glass Fiber Reinforced Concrete 
  • Glass Fiber Reinforced Gypsum