Menu

Fremont Area Medical Center Tower Addition

This project was a patient tower addition to the existing Fremont Area Medical Hospital. This consisted of a six-story addition, along with a five-story renovation to the current structure. The work was constructed in two phases so as not to interfere with the operational hospital.

  • 2013-2015
  • Client: Sampson Construction

Our Scope of Work Included:

  • Panelized & Stick Framed Exterior Cold-Formed Steel Framing
  • Sheathing
  • Rough Carpentry
  • Self-Adhesive Applied Air Barrier
  • EIFS
  • Fireproofing
  • Interior Framing
  • Drywall
  • Insulation
  • Firestopping
  • Glass Fiber Reinforced Concrete
  • Glass Fiber Reinforced Gypsum