PML Construction completed the framing, drywall, and ceiling scopes on the new Lift Solutions Headquarters, working alongside Hausmann Construction. The project combined a prefabricated exterior wall envelope with a showpiece interior — including suspended wood baffle ceilings and acoustic clouds in the lobby — making it both a production job and a finish job at the same time.
Inside, the lobby and main spaces feature a layered ceiling system designed to balance acoustics with high-end finish work. PML installed:
Each system has its own suspension requirements, perimeter trim details, and coordination demands — clouds and baffles need to land cleanly against the surrounding drywall ceilings, with mechanical, lighting, and sprinkler heads laid out around them. The result is a ceiling plane that reads as a designed feature rather than utility infrastructure.
Other Scope Highlights
PML also delivered the gypsum shaft wall assemblies, interior metal framing and drywall throughout, slotted deflection track at all wall heads, and drywall grid suspension for the large-span ceilings — providing a complete envelope-to-finish package on a single contract.
Client: Hausmann Construction
Type: Office
Our Scope of Work: Cold-formed and non-structural metal framing, sheathing, insulation, drywall, shaft wall assemblies, hollow metal frame installation, and acoustical ceilings — including specialty wood baffle and cloud ceilings.
MCL Construction
JE Dunn
McCarthy Building Companies
JE Dunn
Montage Builders
McCarthy Building Companies
JE Dunn
MCL Construction
MCL Construction
Vrana & Son Construction Co.
Kiewit
MCL Construction
Sampson Construction
Sampson Construction
Lockwood Construction
Hausmann Construction
Wietz
Sampson
Lund-Ross Constructors
Darland Construction
Boyd Jones
Graham Construction
MCL Construction
MCL Construction
Lueder Construction
MCL Construction
Sampson Construction
Lueder Construction
Hausmann Construction
B Douglas Construction
MCL Construction