PML worked with MCL Construction on Skutt Catholic High School’s new 425-seat performing arts center in Omaha. Working with the design team, PML redesigned the block-and-steel walls as cold-formed prefab assemblies, saving the owner money and taking months off the schedule. Inside, PML installed the acoustic reflector clouds over the seating, along with framing, drywall, and ceilings throughout. The space hosts performances, religious services, and community events.
Client: MCL Construction
Type: Educational
Our Scope of Work: